Welcome to

This Nautical Gift Shop deals in photographic prints of the USS George H. W. Bush (CVN-77).
These products can be purchased on-line or by visiting:






Montage Prints of the
Aircraft Carrier - USS George H. W. Bush (CVN-77)


Showing several images during it's construction.


Refer to: "PM7012H0"
USS George H. W. Bush (CVN-77) Montage Print.
Top Left:
Newport News, Va. (Sept. 12, 2006) Pre Commissioning Unit (PCU) George H.W. Bush (CVN 77) shown in dry dock. The nuclear-powered aircraft carrier is under construction at Northrop Grumman Newport News shipyard. CVN 77 is the tenth and last Nimitz-class aircraft carrier and is scheduled for christening on Oct. 7, 2006 with delivery to the U.S. Navy in 2008. Photo by Mr. Chris Oxley courtesy Northrop Grumman Ship Building.

Top Right:
Newport News, Va. (Mar. 8, 2005) The 700-ton bow unit, the final keel section of the Nimitz-class aircraft carrier George H. W. Bush (CVN 77), is lowered into place in the dry dock at Northrop Grumman Newport News shipyard. George H. W. Bush is being built using modular construction, a process where smaller sections of the ship below the waterline are lowered into place in dry dock. George H. W. Bush is the second carrier to have the new bulbous bow design that provides more buoyancy to the forward end of he ship and improves hull efficiency. George H. W. Bush is the tenth and final Nimitz-class aircraft carrier and her christening will occur in 2006 with delivery to the U.S. Navy in 2008. Photo courtesy of Northrop Grumman Newport News.

Bottom Left:
Northrop Grumman Newport News Shipyard, Newport News, Va. (July 8, 2006) The completion of the last of 162 super lift evolutions scheduled during the construction of the tenth and last Nimitz-class aircraft carrier, George H.W. Bush (CVN 77). The lift placed the ships 700-ton island superstructure in position on the flight deck. CVN-77 is scheduled for delivery to the U.S. Navy in late 2008. Photo by Rick Thompson courtesy Northrop Grumman Shipbuilding.

Bottom Right:
Newport News, Va. (Apr. 26, 2006) The propellers of the Pre Commissioning Unit (PCU) George H.W. Bush (CVN 77) are installed. The nuclear-powered aircraft carrier is under construction at Northrop Grumman Newport News shipyard. CVN 77 is the tenth and last Nimitz-class aircraft carrier and is scheduled for christening on Oct. 7, 2006 with delivery to the U.S. Navy in 2008. Photo by Mr. John Whalen courtesy Northrop Grumman Ship Building .


These Giclee prints are printed on a heavy weight matte paper and fit STANDARD Frames
(NO Custom Frames required)

PM7012H0
PM7012H0 11x14 (CVN-77) Montage Print @ $10.00
PM7012H0 16x20 (CVN-77) Montage Print @ $15.00
PM7012H0 18x24 (CVN-77) Montage Print @ $22.00
Use "Back Button" on Cart to get back to this page.
Purchased Items will show as being purchased from "wv-prints.com"
FREE Shipping within the contiguous 50 States.


FREE Shipping within the contiguous 50 States.

Didn't find what you were looking for?
Call us at:



Go to:
Home
A-Z Printed Product Index
Aircraft Carrier Directory.
USS George H. W. Bush Ship Store.

wv_prints@wv-prints.com. Refer to "PM7012H0" or Call us at




Posters and Prints of the USS George H. W. Bush (CVN-77) during its Construction.